Gaf liberty 3 ft.
Roll roofing on bare plywood.
So in terms of quantity a roofing roll is about the size of one composite shingle square.
One msr roofing roll is usually about 36 feet long by 36 inches wide.
Rolled roofing is easy to obtain and can be found at all home improvement stores.
Applying roofing felt first will better protect the sheathing against condensation as well as against leaking.
Ideal for slopes greater than 1 2 per foot.
Place the first layer of rolled roofing on the roof.
Offers a complete sbs roofing membrane system.
Solid sheathing in the form of sheets or waterproof plywood.
Nail the roofing in place with short roofing nails spaced 6 inches apart and 1 inch in from the outer edges of the roll roofing.
Set your store to see local.
Smooth down the sheet with your hand to adhere the roll roofing to the roof deck.
Owens corning deckseal sa sbs cap 39 375 ft w x 32 833 ft l 100 sq ft shasta white roll roofing.
Stages of roll roofing installation.
As you place the rolled roofing down stretch it to get rid of wrinkles and creasing.
More product details close.
Or messy solvent based adhesives and are suitable for primed plywood decks and many other substrates.
Installation of shower protectors.
Roll roofing is often installed over bare wood sheathing or sheathing that has been painted with a primer.
Rolled roofing or roll roofing also known as msr comes in rolls of 100 square feet.
Henry lowslope one ply self adhered waterproof roll roofing self adheres with a granulated top surface and can be applied over plywood and oriented strand board osb.
Unroll the roofing and cut a strip to the length necessary for your roof.
Applies easily with clean peel and stick self adhesive application.
All the layers of the web material must be laid offset to the joints so that overlaps do not coincide.
Pull back 6 inches of the release paper in order to position the start of the roofing sheet accurately.
Place the first strip over the starter strips but don t overlap the roof edge.
The first layer should cover the roof as far as the chalk line.
When it s positioned properly nail the roofing down with galvanized roofing nails every four inches along the top and bottom edges.
For a slightly sloped roof use the concealed nail method shown.
Laying vapor barrier material.
It is best to apply these strips horizontally.
If the roof is sloped you can use the exposed nail method.
Align the length of roll roofing with the lowest edge of the flat roof and flush to the side edge of the roof.
Ft sbs self adhering cap sheet roll for low slope roofing in slate model 3730750 101 02 roll 101 02 roll free delivery.