At this point you ve cut 1 roof rafter.
Roof sheeting hip plumb cut.
A tapered piece of sheathing can be cut to fill in at the eave if necessary.
Hip roof framing rafter cut angle template diagram.
All roof rafters should be identical so follow the same steps to measure the plumb cut tail cut and birdsmouth cut.
How to install roof sheathing roof framing part 8 duration.
When one slope is completely sheathed pop a chalk line down any slope edge as in a hip roof that needs to be cut at an angle.
If using a circular saw or compound miter saw set saw bevel angle to 45 to obtain creeper and hip side angles.
This is the pointy end.
Doublewide6 repairs llc 310 141 views.
This is the line to cut along.
The easiest way to make an roof sheathing stick is to lay the first plywood sheathe across the hip rafter and lay a stick parallel with the hip rafter and drive two.
However when the roof slope angle is steeper than an 8 12 pitched roof 33 69007 we will cut the plywood roof sheathing that attaches to the hip or valley rafter on the ground.
Measure back from this line and mark a second parallel line on both sides of the hip.
To mark and cut hip plumb and side cuts with a circular saw print a paper template easy accurate or.
Depending on the size of your structure you will need to cut several or many more.
With the saw bevel angle set to 45 cutting hips and creepers at the plumb cut angle will produce correct side angles.
Mark the end plumb cut angle line back from square on both sides of the hip.
Sheath one slope of the roof at a time ripping the top course to the needed width at the ridge.
See saw miter and blade angle settings.